- Hood Construction began notifying the subcontractors
- Emerald began the asbestos floor tile abatement on the Creason 1st Floor Heating the asbestos floor tile for removal and disposal: 1/2/12 Photo.bmp First Floor Creason area with the asbestos tile removal area underway: 1/2/12 Photo.bmp First Floor Creason area with the asbestos tile removed and ready for removal of the black mastic: 1/2/12 Photos.bmp Drums of aspestos floor tile ready for disposal: 1/2/12 Photos.bmp